Friday 27 January 2012

Long Side Panel Work

After removing the long fixed side panel and leaving the vertical and horizontal supports in place, we proceeded to remove the supports so we can work on them properly.

The 2nd vertical support - note the recess where the horizontal support pieces fit between the upright and the actual side panel. These need to be straightened out.

 The small gap between the upright and the swage line is where the return lip on the top of the side panel fits into plate.

Here you can see the recess for the lower horizontal support and where the upright meets the chassis. This will be removed later to repair it.

No comments:

Post a Comment