Thursday, 14 June 2012

Re-Building The Back End

After stripping all the firewall and bulkhead pieces along with the rear wheel arches out of the van, we've been working on these to straighten them out, repair then and then re-fit them

Nearside rear wheel arch tub is now in place. The bracket sticking up to the left is the fuel tank mounting plate.

The nearside is now in place too

The 'S' shaped pipe is the water drain tube from the spare wheel tray.




With the rear wheel tubs in place, we can now work on the firewall bulkhead

No comments:

Post a Comment